JCi GLOBAL CORPInternational sourcing & procurement

Home  /  Industries

Industries

52 categories.
Nine desks.

A desk is a person, not a dropdown. Every category below is one JCi has sourced or shipped since August 2008 — this is not a wish list. Five carry a documented project: a date, a destination, a thing that arrived.

Categories sourced or shipped
52
Markets delivered into
17 · 4 continents
Trading since
August 2008
Specialist desks
9
52 shown

HS 8429

Heavy & construction equipment

New, refurbished and fleet-lot. Every used unit gets an independent inspection report and hour-meter verification before a wire leaves your bank.

CategoryClassificationTypical lead time
Excavators & loadersSourced or shippedStage V / Tier 4F or de-rated to local fuelHS 8429.528–16 wksQuote this →
Cranes & liftingSourced or shippedCrawler, RT, tower — incl. erection supervisionHS 842612–24 wksQuote this →
Road building & compactionSourced or shippedPavers, rollers, graders, millingHS 8429.408–14 wksQuote this →
Concrete & batching plantSourced or shippedMobile and stationary, incl. commissioningHS 8474.3114–22 wksQuote this →
Crushing & screeningSourced or shippedSized to feed material and target gradationHS 8474.2016–28 wksQuote this →

HS 8433

Agriculture & farm equipment

Specified to soil, crop and — the part most tenders forget — whether anyone within 200km can service it. We build the dealer network alongside the order.

CategoryClassificationTypical lead time
TractorsSourced or shipped25–400 hp, incl. parts packageHS 8701.9010–18 wksQuote this →
Harvesters & combinesSourced or shippedHeader matched to crop and yieldHS 8433.5114–24 wksQuote this →
Implements & tillageSourced or shippedPloughs, seeders, sprayers, balersHS 84326–12 wksQuote this →
Irrigation systemsSourced or shippedPivot, drip, pump stationsHS 8424.828–16 wksQuote this →
Grain storage & processingSourced or shippedSilos, dryers, mills, handlingHS 843716–30 wksQuote this →

HS 8802

Aircraft, jets & rotorcraft

Airframe search, records audit, pre-buy inspection, escrow, de-registration and ferry. We do not take manufacturer commissions on aircraft, and we say so in writing.

CategoryClassificationTypical lead time
Private & business jetsSourced or shippedLight to ultra-long-rangeHS 8802.406–20 wksQuote this →
Light & general aviationDocumented projectPiston and light turbine, incl. ferry flightHS 8802.206–16 wksQuote this →
Turboprops & regionalSourced or shippedPax, combi, quick-changeHS 8802.308–24 wksQuote this →
HelicoptersDocumented projectUtility, EMS, offshore, VIPHS 8802.1210–26 wksQuote this →
Freighters & conversionsSourced or shippedIncl. P2F conversion slotsHS 8802.4012–30 wksQuote this →
Ground support equipmentSourced or shippedGPU, tugs, de-icing, stairsHS 87058–16 wksQuote this →

HS 8901

Marine, vessels & yachts

Class survey, flag transfer, bunkers, crew and the delivery voyage. The mandate closes at your berth, not at the seller's.

CategoryClassificationTypical lead time
Bulk carriers & tankersSourced or shippedS&P and newbuild slotsHS 8901.208–40 wksQuote this →
Tugs & workboatsSourced or shippedHarbour, ASD, offshore supportHS 89046–20 wksQuote this →
Ferries & passengerSourced or shippedRoPax, fast ferry, riverHS 8901.1012–36 wksQuote this →
Yachts & pleasure craftDocumented projectBrokerage, survey and deliveryHS 89038–28 wksQuote this →
Personal watercraft & outboardsDocumented projectJetskis, outboard motors, trailers, partsHS 8903 / 8407.212–8 wksQuote this →
Port & terminal equipmentSourced or shippedSTS, RTG, reach stackersHS 8426.1916–30 wksQuote this →

HS 8704

Vehicles & fleets

Homologation is where fleet deals die. We check it in week one — emissions class, right-hand drive, lighting, axle load — before anyone quotes you a unit price.

CategoryClassificationTypical lead time
Commercial trucks & trailersSourced or shippedRigid, tractor, tipper, tankerHS 87048–20 wksQuote this →
Buses & coachesSourced or shippedCity, intercity, school, CKDHS 870212–24 wksQuote this →
Passenger & luxuryDocumented projectIncl. armoured and protocol fleetsHS 87034–16 wksQuote this →
Electric vehicles & chargingSourced or shippedVehicles plus depot chargingHS 8703.808–20 wksQuote this →
Emergency & specialistSourced or shippedAmbulance, fire, utility, mobile clinicHS 870514–28 wksQuote this →

NAICS 33

Industrial, mining & energy

Full lines rather than boxes. Layout, utilities draw, spares holding and the commissioning engineer's flights are all in the landed number.

CategoryClassificationTypical lead time
Production & assembly linesSourced or shippedTurnkey, incl. installation supervisionHS 847920–40 wksQuote this →
Mining equipmentSourced or shippedSurface and undergroundHS 843016–32 wksQuote this →
Oil & gas equipmentSourced or shippedDrilling, wellhead, processingHS 8431.4314–30 wksQuote this →
Power generationSourced or shippedGensets, turbines, switchgearHS 850212–28 wksQuote this →
Machine toolsSourced or shippedCNC, press, fabricationHS 845810–22 wksQuote this →

UNSPSC 42

Medical & emergency response

Cold chain, calibration, consumables and training. An MRI with no service contract and no trained radiographer is a very expensive room.

CategoryClassificationTypical lead time
Diagnostic imagingSourced or shippedMRI, CT, X-ray, ultrasoundHS 9018.1312–24 wksQuote this →
Surgical & theatreSourced or shippedTables, lights, anaesthesia, sterilisationHS 9018.908–16 wksQuote this →
LaboratorySourced or shippedAnalysers, incl. reagent supplyHS 90278–18 wksQuote this →
Field hospitals & shelterSourced or shippedDeployable, incl. power and waterHS 94066–14 wksQuote this →
Fire & rescue equipmentSourced or shippedAppliances, PPE, extricationHS 8424.1010–22 wksQuote this →

CPV 45

Infrastructure, renewables & utilities

EPC-ready bills of materials. We consolidate multi-country packages at a bonded hub so the site sees one landed cost and one delivery schedule.

CategoryClassificationTypical lead time
Solar PV packagesSourced or shippedModules, inverters, trackers, BOSHS 8541.4310–20 wksQuote this →
Wind turbinesSourced or shippedIncl. blade transport studyHS 8502.3124–52 wksQuote this →
Water treatment & desalinationSourced or shippedRO, MBR, pump stationsHS 8421.2116–36 wksQuote this →
Waste management systemsSourced or shippedCollection, sorting, WtEHS 8479.8914–28 wksQuote this →
Data centre infrastructureSourced or shippedPower, cooling, racks, containmentHS 851712–26 wksQuote this →
Telecom & smart city systemsSourced or shippedTowers, fibre, ITS, meteringHS 853712–24 wksQuote this →

RE / COM

Real estate, land & commodities

Title, zoning, encumbrances and access checked before price is discussed. Commodity lots are quoted against assay and inspection at load port.

CategoryClassificationTypical lead time
Industrial & warehouseSourced or shippedPort-adjacent and inland4–16 wksQuote this →
Commercial & officeSourced or shippedSingle asset and portfolio6–20 wksQuote this →
Residential & investmentSourced or shippedIncl. build-to-rent blocks4–14 wksQuote this →
Land acquisitionSourced or shippedTitle, zoning, access, utilities8–36 wksQuote this →
Ports, airports & terminalsSourced or shippedConcession and asset transactions20–60 wksQuote this →
Hotels & resortsSourced or shippedOperating and development8–28 wksQuote this →
Building materialsSourced or shippedCement, steel, aggregate, timberHS 25 / 724–12 wksQuote this →
Commodity sourcingSourced or shippedAgainst assay and load-port inspectionVaries2–8 wksQuote this →
Luxury goodsSourced or shippedProvenance verifiedVaries2–10 wksQuote this →

How we execute

We do not own ships. We own the contract.

Worth being plain about, because the companies that are vague here are vague for a reason.

  • JCi sources and oversees. Finding it, pricing it, screening the supplier, structuring the payment, and standing over the shipment until it is signed for — that is us, on every mandate.
  • The freight is run with partner shippers and exporters. A network built over 18 years. Lou Mamaou books Grimaldi RoRo on the West Africa routes when the schedule and the cargo suit it; other lanes, other partners.
  • One contract, regardless. You are not handed to a forwarder in week six and told to take it up with them. If a partner drops the box, it is still our name on the paper.
  • That is why the inland legs work. Tema to Ouagadougou is not a shipping line’s problem. It is ours, and we have been solving it since 2010.

Before you send anything

Four answers turn a wish into a quote.

Most enquiries stall because one of these is missing. If you have all four, we can usually give an indicative landed cost within five business days.

01

Quantity or capacity

Units, tonnes per hour, megawatts, hectares, gross tonnage. A number, even a rough one, beats an adjective.

02

Destination

Port, city or site. Duty, inland freight and clearance can move a landed cost by 30% between two towns in the same country.

03

Date it must work by

Not when you'd like it — when the contract, harvest or grid connection actually needs it running.

04

What's already fixed

A specified brand, a standard, a lender's condition, a tender clause. Tell us the constraints and we'll work inside them.

Missing some of it? Send it anyway. Working out the rest is stage one of the mandate.

Request a quote →